Mizan Boutique Hotel Lobby — AlUla

AlUla2025Concept study

A hotel lobby with specialist materials and long lead times, delivered on a site remote from the supply base.

Mizan hotel lobby with rammed-earth walls

Demonstration content — replaced from the CMS.

Overview

Delivery on a remote site requiring early procurement planning.

Challenge

  • Long lead times on specialist materials.
  • Site distance from supply centres.

Scope of work

  • Rammed-earth walls
  • Bronze reception desk
  • Woven ceiling detail

Execution process

  1. 01

    Procurement

    Locking specialist materials.

  2. 02

    Execution

    Site works and installation.

Materials and details

  • Rammed earth

    Walls with exposed layering.

  • Bronze

    Reception desk cladding.

Intended concept outcome

  • Works are progressing to the agreed programme.